NYC DOB record · Q01454852-I1

135-20 39 Avenue

135-20 39 Avenue, Queens, NY 11354

Alteration filing in Flushing-Willets Point, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01454852-I1

135-20 39 Avenue

Queens, NY 11354

Alteration filing · status dated Nov 6, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
173
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01454852-I1 as a alteration filing at 135-20 39 Avenue, Queens, NY 11354. Its latest published status category is Approved, dated Nov 6, 2026. The filing records 173 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 6, 2026
Proposed scale
173 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 4112316Applicant of recordSee the 327 filings that name Bazini Engineering, P.C.
FiledSep 16, 2026
Current recordApproved
Proposed scale173 units
Recorded cost$400,000

What the filing says

A public-record reading of the proposed work.

Replace (1) boiler and gas burner and (1) hot water boiler with (3) gas-fired hot water heaters. install (3) hot water storage tanks as per plans. cap and remove gas piping to remove (2) boilers; 165906-01 & 830079-07. no change in use, egress or occupanc

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story hotel built in 1989, on a 31,452 sq ft lot.

Built
1989
Last altered
2016
Floors
15
Residential units
0
Building type
Hotel
Land use
Commercial and office
Zoning district
C4-2
Lot area
31,452 sq ft
Building area
237,452 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01454852-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01454852-I1
BBL
4049760015
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
173
Proposed dwelling units
173