NYC DOB record · Q01327168-S3

138-38 37 Avenue

138-38 37 Avenue, Queens, NY 11354

New building filing in Flushing-Willets Point, Queens. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01327168-S3

138-38 37 Avenue

Queens, NY 11354

New building · status dated Sep 23, 2026

Current record
Under review
Proposed scale
18 stories
Dwelling units
156
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01327168-S3 as a new building at 138-38 37 Avenue, Queens, NY 11354. Its latest published status category is Under review, dated Sep 23, 2026. The filing records 18 proposed stories and 156 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Under review
Latest status date
Sep 23, 2026
Proposed scale
18 proposed stories and 156 proposed dwelling units
Applicant of recordSee the 428 filings that name Cosentini Associates
FiledFeb 19, 2026
Current recordUnder review
Proposed scale18 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

NYC devhub consultation conducted 1/21/26: (bldg b) mechanical work in conjunction with new building construction

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01327168-S3.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01327168-S3
BIN
4625945
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
18
Existing dwelling units
Empty in the source
Proposed dwelling units
156