What the filing says
A public-record reading of the proposed work.
Proposed interior renovations of existing one family house to repair fire damage.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story one-family home built in 2002, on a 1,275 sq ft lot.
- Built
- 2002
- Floors
- 2
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R3-2
- Lot area
- 1,275 sq ft
- Building area
- 1,751 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Apr 9, 2025.
- Construction
Issued Apr 9, 2025 — PREMISES RENDERED NON-COMPLIANT DUE TO THREE ALARM FIRE. NOTED: THERE IS HEAVY SMOKE, WATER AND FIRE DAMAGE WITH REAR ROOF OPEN AND REAR DECK COMPLETELY BURNED. LEAVING PREMISES OPEN TO THE ELEMENTS.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S01286648-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 67,630 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01286648-I1
- BBL
- 5028400082
- Postal code
- 10304 · 115 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 1
- Proposed dwelling units
- 1