NYC DOB record · B01060226-I1

140 Cadman Plaza West

140 Cadman Plaza West, Brooklyn, NY 11201

Alteration filing in Brooklyn Heights, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01060226-I1

140 Cadman Plaza West

Brooklyn, NY 11201

Alteration filing · status dated Sep 14, 2026

Current record
Approved
Proposed scale
27 stories
Dwelling units
250
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01060226-I1 as a alteration filing at 140 Cadman Plaza West, Brooklyn, NY 11201. Its latest published status category is Approved, dated Sep 14, 2026. The filing records 27 proposed stories and 250 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 14, 2026
Proposed scale
27 proposed stories and 250 proposed dwelling units
The building, not the filingopen housing violations and every filing at BIN 3001548Applicant of recordSee the 9 filings that name Lawless & Mangione, LLP
FiledJun 13, 2024
Current recordApproved
Proposed scale27 stories
Recorded cost$7.7M

What the filing says

A public-record reading of the proposed work.

General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanical bulkhead at main roof. No change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 27-story elevator apartment building built in 1967, with 250 homes, on a 34,821 sq ft lot.

Built
1967
Floors
27
Residential units
250
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8
Lot area
34,821 sq ft
Building area
352,698 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 57 notices on file; the most recent was issued Aug 27, 2026.

  • Construction

    Issued Aug 27, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT EXPOSUR E 1EAST ELEVATION DETERIORATED CONCRETE WITH EXPOSED REBAR,DAMAGED AND CRACKED TERRACES AND MASONRY THOUGHOUT ALL EXPOSURES,CRACKED PARAPET O N LEANING EDGE OF EXPOSURES 2,3,AND 4.REMEDY:REPAIR AND/OR REPLACE

  • No report and / or late filing (facade)

    Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024

  • Hazardous condition (facade)

    Issued Feb 21, 2024 — CYCLE 9C UNSAFE REPORT FILED

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01060226-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01060226-I1
BBL
3002120001
Review type
Standard Plan Examination
Existing stories
27
Proposed stories
27
Existing dwelling units
250
Proposed dwelling units
250
General constructionStructural work