What the filing says
A public-record reading of the proposed work.
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 27-story elevator apartment building built in 1967, with 250 homes, on a 34,821 sq ft lot.
- Built
- 1967
- Floors
- 27
- Residential units
- 250
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8
- Lot area
- 34,821 sq ft
- Building area
- 352,698 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 57 notices on file; the most recent was issued Aug 27, 2026.
- Construction
Issued Aug 27, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT EXPOSUR E 1EAST ELEVATION DETERIORATED CONCRETE WITH EXPOSED REBAR,DAMAGED AND CRACKED TERRACES AND MASONRY THOUGHOUT ALL EXPOSURES,CRACKED PARAPET O N LEANING EDGE OF EXPOSURES 2,3,AND 4.REMEDY:REPAIR AND/OR REPLACE
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Hazardous condition (facade)
Issued Feb 21, 2024 — CYCLE 9C UNSAFE REPORT FILED
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00017379-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00017379-I1
- BBL
- 3002120001
- Postal code
- 11201 · 5869 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source