NYC DOB record · M01440593-I1

140 East 28 Street

140 East 28 Street, Manhattan, NY 10016

Alteration filing in Gramercy, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 13, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01440593-I1

140 East 28 Street

Manhattan, NY 10016

Alteration filing · status dated Sep 10, 2026

Current record
Approved
Proposed scale
13 stories
Dwelling units
107
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01440593-I1 as a alteration filing at 140 East 28 Street, Manhattan, NY 10016. Its latest published status category is Approved, dated Sep 10, 2026. The filing records 13 proposed stories and 107 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 10, 2026
Proposed scale
13 proposed stories and 107 proposed dwelling units
Complete building dossierView all 5 filings associated with BIN 1018189Applicant of recordSee the 8 filings that name Craft Design Architecture PLLC
FiledAug 4, 2026
Current recordApproved
Proposed scale13 stories
Recorded cost$50,000

What the filing says

A public-record reading of the proposed work.

Interior renovation and combination of existing dwelling unit 2b + 2c. work includes removal and installation and alteration of non-bearing interior partitions, plumbing, and general work as shown on drawings.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 13-story elevator apartment building built in 1931, with 107 homes, on a 11,109 sq ft lot.

Built
1931
Last altered
1989
Floors
13
Residential units
107
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8B
Lot area
11,109 sq ft
Building area
98,359 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 14 open notices on record for this building, out of 60 notices on file; the most recent was issued Jun 23, 2024.

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023

  • Hazardous condition (facade)

    Issued Feb 21, 2024 — CYCLE 9C UNSAFE REPORT FILED

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • 11 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01440593-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01440593-I1
BBL
1008830058
Review type
Standard Plan Examination
Existing stories
13
Proposed stories
13
Existing dwelling units
107
Proposed dwelling units
107
General construction