What the filing says
A public-record reading of the proposed work.
Alt 2 filing to combine apts 24d & 24e. work includes removal of kitchen in apt 24d and a new master bathroom. no exterior work. no change in use, egress or occupancy. existing co remains unchanged (ref tppn 03/97 & ll/1968). complies with tppn 03/97
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 29-story condominium built in 1964, with 561 homes, on a 71,050 sq ft lot.
- Built
- 1964
- Floors
- 29
- Residential units
- 561
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R8
- Lot area
- 71,050 sq ft
- Building area
- 648,458 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 26, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 63 notices on file; the most recent was issued Mar 6, 1989.
- Elevator
Issued Mar 6, 1989 — (51)RETURN TO SERVICE OR FILE PAPERS FOR DISMANTLING AND OR REMOVAL
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01380476-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,253 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01380476-I1
- BBL
- 1011587504
- Postal code
- 10023 · 859 filings
- Review type
- Standard Plan Examination
- Existing stories
- 29
- Proposed stories
- 29
- Existing dwelling units
- 560
- Proposed dwelling units
- 560








