NYC DOB record · M01249800-I1

205 West End Avenue

205 West End Avenue, Manhattan, NY 10023

Alteration filing in Upper West Side-Lincoln Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01249800-I1

205 West End Avenue

Manhattan, NY 10023

Alteration filing · status dated Sep 29, 2026

Current record
Approved
Proposed scale
28 stories
Dwelling units
538
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01249800-I1 as a alteration filing at 205 West End Avenue, Manhattan, NY 10023. Its latest published status category is Approved, dated Sep 29, 2026. The filing records 28 proposed stories and 538 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 29, 2026
Proposed scale
28 proposed stories and 538 proposed dwelling units
Applicant of recordSee the 6 filings that name Vail Associates Architects
FiledAug 14, 2025
Current recordApproved
Proposed scale28 stories
Recorded cost$128,500

What the filing says

A public-record reading of the proposed work.

Alt type 2 to combine apt 10d & 10e. remove kitchen at 10e and new laundry room. upgrade one existing bathroom. remove tub and new shower, replaced toilet and vanity. new wookd floor new framing and doors. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 28-story condominium built in 1962, with 543 homes, on a 90,575 sq ft lot.

Built
1962
Floors
28
Residential units
543
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R8
Lot area
90,575 sq ft
Building area
642,284 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01249800-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01249800-I1
BIN
1070766
BBL
1011797503
Review type
Standard Plan Examination
Existing stories
28
Proposed stories
28
Existing dwelling units
538
Proposed dwelling units
538
General construction