What the filing says
A public-record reading of the proposed work.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1910, with 3 homes, on a 1,250 sq ft lot.
- Built
- 1910
- Last altered
- 1979
- Floors
- 3
- Residential units
- 3
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- C1-9
- Lot area
- 1,250 sq ft
- Building area
- 4,800 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 12 open notices on record for this building, out of 12 notices on file; the most recent was issued Sep 27, 2024.
- Construction
Issued Sep 27, 2024 — FAILURE TO MAINTAIN EXTERIOR BUILDING IN A COMPLIANT MANNER.AS NOTED I OBSERVED ON EXP1 EAST ELEV AND EXP2 SOUTH ELEV,SEVERELY DAMAGED SPALL ING,ERODED,DISINTEGRATED MASONRY LINTELS AND SILLS AT SEVERAL FLOORS.R OTTED METAL CORNIC IN SOME AREAS.REMEDY:REPAIR AND/OR REPLACE ALL DAMA GED FACADE AND APPURTENANCES
- Construction
Issued May 7, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED SEVERELY SPALLED/SPALLING STONE WORK, DEFECTIVE/DAMAGE LINTELS AND SILLS AND DETERIORATED CORNICE. REMEDY: REPAIR/REPLACE
- Construction
Issued Jan 11, 2024 — EMERGENCY WORK ORDER DUE TO THE FOLLOWING CONDITION:SEVERELY SPALLED/S PALLING STONE WORK;DEFECTIVE/DAMAGED LINTELS & SILLS AND DETERIORATED CORNICE.REMEDY:IMMEDIATELY PROVIDE APPROVED SAFETY MEASURES AND MAKE REPAIRS UNDER DIRECT SUPERVISION OF LICENSED PROFESSIONAL
9 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01448086-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01448086-I1
- BIN
- 1043181
- BBL
- 1014110113
- Postal code
- 10075 · 279 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 3
- Proposed dwelling units
- 3