NYC DOB record · B00620232-P1

142 South Portland Avenue

142 South Portland Avenue, Brooklyn, NY 11217

Alteration filing in Fort Greene, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00620232-P1

142 South Portland Avenue

Brooklyn, NY 11217

Alteration filing · status dated Jun 1, 2022

Current record
Approved
Proposed scale
Not stated
Dwelling units
104
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00620232-P1 as a alteration filing at 142 South Portland Avenue, Brooklyn, NY 11217. Its latest published status category is Approved, dated Jun 1, 2022. The filing records 104 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Jun 1, 2022
Proposed scale
104 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3427387Applicant of recordSee the 200 filings that name Joselow & Associates, LLC
FiledMay 26, 2022
Current recordApproved
Proposed scale104 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Temporary Standpipe system for a new 13 story+cellar, mixed-use, building with 104 units and community facilities. filed in conjunction with NB Job#321593101.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00620232-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00620232-P1
BBL
3020030037
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
104
standpipe