What the filing says
A public-record reading of the proposed work.
Herewith filing masonry repairs per plans. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story elevator apartment building built in 1907, with 49 homes, on a 25,525 sq ft lot.
- Built
- 1907
- Last altered
- 2011
- Floors
- 5
- Residential units
- 49
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- M1-2/R6A
- Lot area
- 25,525 sq ft
- Building area
- 104,661 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 13 open notices on record for this building, out of 14 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Nov 3, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE AT THE TIME OF INSPECTION,I OBSERVED ON EXP1,CRACK SILL ON 3RD FL,BROKEN WINDOW PA NES ON 4TH AND 5TH FL,STEP CRACK IN 3RD FL SPANDRELS AT MULTIPLE LOCAT IONS.EXP2 NORTH ELEV,BROKEN AND MISSING WINDOW PANE,MISSING MORTAR JOI NT AT PARAPET AND SEVERAL OTHER LOCATIONS.REMEDY:REPAIR OR REPLACE
- Construction
Issued Nov 3, 2025 — EWO DUE TO IMMINENT HAZARDOUS CONDITION ON BULK HEAD @ SOUTH-EAST CORNER OF EAST ELEV.LOOSE BULGING BRICKS, STEP CRACKS, LOOSE OPEN MORTAR JOINT, CORRODED SAGGING METAL LINTELS,BROKEN WINDOW PANES REMEDY: IMMEDIATELY PROVIDE SAFE MEAS TO PROTECT PUBLIC U/SUPV OF NYC LIC PROF.SIDEWALK SHED ON EXP3 MUST BE EXTENDED PASS BULK HEAD OF BLDG
10 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 9, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01115105-P1.
- Current status updated02
The latest recorded filing status is “Objections.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01115105-P1
- BIN
- 3342064
- BBL
- 3023680001
- Postal code
- 11211 · 3526 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 0
- Proposed dwelling units
- 0