What the filing says
A public-record reading of the proposed work.
Install fuel storage tank, oil transfer pump, oil transfer piping and generator for 15 stories hotel in conjunction of DOB nb# 421949574. no change of use,egress and occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 15-story hotel built in 2021, on a 4,400 sq ft lot.
- Built
- 2021
- Last altered
- 2020
- Floors
- 15
- Residential units
- 0
- Building type
- Hotel
- Land use
- Commercial and office
- Zoning district
- C6-4
- Lot area
- 4,400 sq ft
- Building area
- 40,903 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 27, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Mar 18, 2026.
- Construction
Issued Mar 18, 2026 — EWO DUE TO DEFECTIVE FACADE.SPALLING/LOOSE MATERIAL @ EXP3.SECTION OF EIFS FALLING TO ADJACENT BLDG. REMEDY:IMMEDIATELY INSTALL SAFE MEAS @ ALL EPS TO PROT PUBLIC,THE OWNER MUST HIRE PROFESSIONAL ENGINEER TO INSPECT & EVALUATE THE CONDITION & SUBMIT REPORT. IMMEDIATELY REMOVE ALL LOOSE MATERIAL & FILE UNSAFE REPORT
- Construction
Issued Mar 18, 2026 — FTM FACADE & APPURT DUE TO A SECTION OF EIFS FALLING & FALLING ON TO ADJACENT BLDG ROOF.REMEDY:OWNER TO RETAIN SVCS OF NYS REG DES PROF WITH QEWI CERT TO INSPECT & EVLUATE 100% OF EITS (HANDS-ON SOUND) AT ALL EXPS. INSTALL/MAINT PUB PROTECTION ON ENTIRE PERIMETER OF BLDG FILE & SUBMIT HANDS-ON REPORT TO FACADES@BUILDINGS.NYC.GOV
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 27, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q00337617-S1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q00337617-S1
- BBL
- 4099930001
- Postal code
- 11435 · 121 filings
- Review type
- Standard Plan Examination
- Existing stories
- 15
- Proposed stories
- 15
- Existing dwelling units
- 105
- Proposed dwelling units
- 105