NYC DOB record · Q00817188-I1

144-02 94 Avenue

144-02 94 Avenue, Queens, NY 11435

Alteration filing in Jamaica, Queens. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 31, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00817188-I1

144-02 94 Avenue

Queens, NY 11435

Alteration filing · status dated Oct 29, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00817188-I1 as a alteration filing at 144-02 94 Avenue, Queens, NY 11435. Its latest published status category is Recorded as completed, dated Oct 29, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 29, 2026
Proposed scale
1 proposed dwelling unit
The building, not the filingopen housing violations, the owner of record and every filing at BIN 4625212Applicant of recordSee the 885 filings that name Fl&m Engineering Design &inspection
FiledJan 31, 2023
Current recordRecorded as completed
Proposed scale1 units
Recorded cost$2,240

What the filing says

A public-record reading of the proposed work.

Installation of needle beam as per plans. needle beam shall comply with chapter #33 of the NYC buildinds code. no change in use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story hotel built in 2021, on a 4,400 sq ft lot.

Built
2021
Last altered
2020
Floors
15
Residential units
0
Building type
Hotel
Land use
Commercial and office
Zoning district
C6-4
Lot area
4,400 sq ft
Building area
40,903 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Mar 18, 2026.

  • Construction

    Issued Mar 18, 2026 — EWO DUE TO DEFECTIVE FACADE.SPALLING/LOOSE MATERIAL @ EXP3.SECTION OF EIFS FALLING TO ADJACENT BLDG. REMEDY:IMMEDIATELY INSTALL SAFE MEAS @ ALL EPS TO PROT PUBLIC,THE OWNER MUST HIRE PROFESSIONAL ENGINEER TO INSPECT & EVALUATE THE CONDITION & SUBMIT REPORT. IMMEDIATELY REMOVE ALL LOOSE MATERIAL & FILE UNSAFE REPORT

  • Construction

    Issued Mar 18, 2026 — FTM FACADE & APPURT DUE TO A SECTION OF EIFS FALLING & FALLING ON TO ADJACENT BLDG ROOF.REMEDY:OWNER TO RETAIN SVCS OF NYS REG DES PROF WITH QEWI CERT TO INSPECT & EVLUATE 100% OF EITS (HANDS-ON SOUND) AT ALL EXPS. INSTALL/MAINT PUB PROTECTION ON ENTIRE PERIMETER OF BLDG FILE & SUBMIT HANDS-ON REPORT TO FACADES@BUILDINGS.NYC.GOV

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00817188-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 90,393 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00817188-I1
BBL
4099930001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1