NYC DOB record · B00493384-P1

144 Clymer Street

144 Clymer Street, Brooklyn, NY 11211

Alteration filing in South Williamsburg, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin.

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00493384-P1

144 Clymer Street

Brooklyn, NY 11211

Alteration filing · status dated Dec 17, 2021

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00493384-P1 as a alteration filing at 144 Clymer Street, Brooklyn, NY 11211. Its latest published status category is Approved, dated Dec 17, 2021. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 17, 2021
Proposed scale
Not stated in this filing
Complete building dossierView all 15 filings associated with BIN 3428764Applicant of recordSee the 350 filings that name Fl&m Engineering Design &inspection
FiledDec 17, 2021
Current recordApproved
Proposed scaleNot specified
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary pipe scaffolding as per plans during construction. no change in use, egress or occupancy, shall comply with chapter 33 of NYC building code of 2014.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00493384-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00493384-P1
BBL
3021730006
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0