What the filing says
A public-record reading of the proposed work.
Installation of pipe scaffold as per plans. no change in use, egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story condominium built in 1912, with 27 homes, on a 7,080 sq ft lot.
- Built
- 1912
- Floors
- 5
- Residential units
- 27
- Building type
- Condominium
- Land use
- Walk-up apartments
- Zoning district
- R7A
- Lot area
- 7,080 sq ft
- Building area
- 17,525 sq ft
- Historic district
- Park Slope Historic District Extension
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 5 notices on file; the most recent was issued Dec 16, 2025.
- Construction
Issued Dec 16, 2025 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B01019242-I1 ON 10/22/25. INTENT TO REVOKE APPROVAL AND PERMIT. STOP ALL WORK AND MAKE SITE SAFE.
- Construction
Issued Apr 3, 2001 — HAZARDOUS
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00033540-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Sign-off date recorded03
DOB lists a sign-off date for this filing.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00033540-I1
- BBL
- 3010937501
- Postal code
- 11215 · 4239 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source