What the filing says
A public-record reading of the proposed work.
Herewith filing to merge apartments 3E and 3F and to perform light interior renovation work. No change to use, occupancy, egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story condominium built in 1912, with 27 homes, on a 7,080 sq ft lot.
- Built
- 1912
- Floors
- 5
- Residential units
- 27
- Building type
- Condominium
- Land use
- Walk-up apartments
- Zoning district
- R7A
- Lot area
- 7,080 sq ft
- Building area
- 17,525 sq ft
- Historic district
- Park Slope Historic District Extension
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 5 notices on file; the most recent was issued Dec 16, 2025.
- Construction
Issued Dec 16, 2025 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B01019242-I1 ON 10/22/25. INTENT TO REVOKE APPROVAL AND PERMIT. STOP ALL WORK AND MAKE SITE SAFE.
- Construction
Issued Apr 3, 2001 — HAZARDOUS
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00528830-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00528830-I1
- BBL
- 3010937501
- Postal code
- 11215 · 4239 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 29
- Proposed dwelling units
- 28








