What the filing says
A public-record reading of the proposed work.
Immediate Emergency Declaration: Install temporary shoring and weatherproofing as required to stabilize the hole in the CMU due to the car crash. Install temporary partition to protect the damaged area from unauthorized access.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story store building built in 1987, on a 45,020 sq ft lot.
- Built
- 1987
- Floors
- 1
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- C4-1
- Lot area
- 45,020 sq ft
- Building area
- 19,200 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 31 notices on file; the most recent was issued Sep 4, 2026.
- Construction
Issued Sep 4, 2026 — EMERGENCY WORK ORDER-EXP1 IS ALONG FOREST AVE & EX4 ALONGLIVERMORE AVE WAS REPORTED TO IMPACT THE BLDG ON/AROUND8/27/26 LEAVING EXP4 WALL PARTIALLY COLLAPSED & OPEN APPROX 8FT W BY 3.5 FT TALL. OWNER TO IMMED RETAIN NYSPE TO IMMED INSTALL TEMP SHORING & WEATHERPROOFING AS REQ'D TO STABLIZE & WEATHERPROOF EXP4 CMU WALL
- Immediate
Issued Aug 27, 2026 — SEAL ALL OPENINGS DUE TO VEHICLE IMPACT TO PREVENT UNAUTHORIZED ENTRY
- Elevator
Issued Feb 10, 2021
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S01456172-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01456172-I1
- BIN
- 5106784
- BBL
- 5003930011
- Postal code
- 10302 · 77 filings
- Review type
- Professional Certification
- Existing stories
- 1
- Proposed stories
- 1
- Existing dwelling units
- 0
- Proposed dwelling units
- 0