What the filing says
A public-record reading of the proposed work.
Repair or replacement of stucco; decorative stone; mortar joints on the facades as per indicated on plan.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1910, on a 2,461 sq ft lot.
- Built
- 1910
- Floors
- 3
- Residential units
- 2
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R5
- Lot area
- 2,461 sq ft
- Building area
- 5,694 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 9 notices on file; the most recent was issued Oct 24, 2025.
- Construction
Issued Oct 24, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#347850 VIO#090225PI40703SB DATED 9/2/25 REQUIRING OWNER TO PROVIDE CORRECTIVE ACTION PLAN BY 9/16/25 & START BLDG REPAIRS UNDER PERMIT BY 11/02/25&COMPLETED/SIGNOFF BY 12/2/25 AS OF 10/24/25 A CAP&EVIDENCE OF REPR WORK WAS NOT REC'D IMMED COMPLY W/COMMISSIONER'S ORDER 347850 VIO#090225PI40703SB
- Construction
Issued Sep 2, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP 1 SPALLED DECORATIVE STONE @ MAIN ENTRANCE ASEVERLY CRACKED/SPALLING HEADER STONE ABOVE 3FL WINDOW & SPALLING/CRACKED MASORNY @ PARAPET. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD TANDING W/DOB&NYS EVAL THE ENITE BLDG & SUBMIT A CORRECTIVE ACTION PLAN BY 9/16/2025.BLDG T/BE REPAIRED UNDER PERMIT
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01321247-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01321247-I1
- BIN
- 4114895
- BBL
- 4050560024
- Postal code
- 11355 · 242 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








