NYC DOB record · M01004567-I1

15 East 54 Street

15 East 54 Street, Manhattan, NY 10022

Full demolition filing in Midtown-Times Square, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedFull demolition

NYC Department of Buildings · w9ak-ipjd · accessed Oct 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01004567-I1

15 East 54 Street

Manhattan, NY 10022

Full demolition · status dated Oct 14, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01004567-I1 as a full demolition at 15 East 54 Street, Manhattan, NY 10022. Its latest published status category is Approved, dated Oct 14, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Full demolition
Latest status
Approved
Latest status date
Oct 14, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations and every filing at BIN 1081153Applicant of recordSee the 212 filings that name Ancora Engineering, PLLC
FiledMar 13, 2024
Current recordApproved
Proposed scaleNot specified
Recorded cost$2.3M

What the filing says

A public-record reading of the proposed work.

Full demolition of 9 story structure using hand held and mechanical means to assist from within.

Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 19-story office building built in 1955, on a 18,409 sq ft lot.

Built
1955
Last altered
2025
Floors
19
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-2.5
Lot area
18,409 sq ft
Building area
283,465 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 15, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 42 notices on file; the most recent was issued Sep 3, 2019.

  • Sprinkler

    Issued Sep 3, 2019 — FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01004567-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01004567-I1
BBL
1012900006
Review type
Standard Plan Examination
Existing stories
9
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
Empty in the source