NYC DOB record · B01256676-I1

1515 47 Street

1515 47 Street, Brooklyn, NY 11219

Alteration filing in Borough Park, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01256676-I1

1515 47 Street

Brooklyn, NY 11219

Alteration filing · status dated Aug 28, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
54
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01256676-I1 as a alteration filing at 1515 47 Street, Brooklyn, NY 11219. Its latest published status category is Recorded as completed, dated Aug 28, 2026. The filing records 54 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 28, 2026
Proposed scale
54 proposed dwelling units
The building, not the filingapartment sizes, the owner of record and every filing at BIN 3128609Applicant of recordSee the 70 filings that name Kma Designs LLC
FiledJul 18, 2025
Current recordRecorded as completed
Proposed scale54 units
Recorded cost$7,500

What the filing says

A public-record reading of the proposed work.

Installation of heavy duty sidewalk shed. no change in use, occupancy or egress under this application, all work to comply with chapter 33 of nycbc.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1939, with 54 homes, on a 14,034 sq ft lot.

Built
1939
Floors
6
Residential units
54
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
14,034 sq ft
Building area
64,530 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 60 open notices on record for this building, out of 75 notices on file; the most recent was issued Oct 22, 2025.

  • Construction

    Issued Oct 22, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#341417 VIO#071525PI31202HZ DATED 07/15/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 08/18/25&START BLDG REPRS UNDER PERMIT BY 09/18/25&COMPL/SIGNED OFF BY 10/18/25 AS OF 10/22/25 A CAP&EVIDENCE OF COMPL REPR WRK WAS NOT REC'D IMMED COMPLY W/COMMISSIONER'S ORDER#341417 VIO#071525PI31202HZ

  • Construction

    Issued Jul 15, 2025 — CORRECTIVE ACTION PLAN REQ'D. OBSVD @ CORNER EDGE OF THE PARAPET WALL- EXP1/2 DISLODGE BRICKS & MORTAR SEPARATION ANOTHER LOCATION OF DISLODGE BRICKS @ THE 3FL NEAR ENTRANCE. OWNER TO IMMED RETAIN A REG DESIGN PROF TO EVAL THE ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV BY 08/18/25

  • Construction

    Issued Jul 15, 2025 — EMERGENCY WORK ORDER-FOR IMMEDIATE SDWLK PROTECTION.INSTALL SDWLK W/ LIGHTNG@THE CRNR 4TH ST&15TH AVE-AS REQ &/OR NEEDED AS PER NYS-PE.FULL LENGTH OF BLDG ON 15TH AVE&TURNING ON 47ST W/EXTENSIONS.INSTALL SIDEWALK STEEL IMMEDIATELY

  • 57 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01256676-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01256676-I1
BBL
3054360068
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
54
Proposed dwelling units
54
Sidewalk shed