What the filing says
A public-record reading of the proposed work.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2014 code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 18-story elevator apartment building built in 1969, with 101 homes, on a 34,400 sq ft lot.
- Built
- 1969
- Floors
- 18
- Residential units
- 101
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 34,400 sq ft
- Building area
- 119,919 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 51 notices on file; the most recent was issued Jul 21, 2026.
- Construction
Issued Jul 21, 2026 — PARTIAL VACATE ORDER: DUE TO CONDITIONS OBSERVED SUCH AS: CRACKED/SPALLING/SPALLED CONCRETE BALCONY SLAB @ MULTIPLE LOCATIONS ON EXPOSURE 1 WEST ELEVATION & EXPOSURE 3 EAST ELEVATIONS REMEDY: VACATE ALL BALCONIES ON EXPOSURE 1 WEST ELEVATION AND EXPOSURE 3 EAST ELEVATION AND RESTRICT ACCESS TO VACATE BALCONIES
- Construction
Issued Jul 1, 2026 — FAILURE TO MAINTAIN BUILDING. AT THE TIME OF INSPECTION, OBSERVED ON EXPOSURE 1 WEST ELEVATION & EXPOSURE 3 EAST ELEVATION: CRACKS & SPALLING BALCONY SLABS AT MULTIPLE FLOORS AND LOCATIONS. REMEDY: REPAIR AND/OR REPLACE ALL DAMAGED, DEFECTIVE, BALCONY SLABS ON EXPOSURE 1 AND EXPOSURE 3 EAST ELEVATION
- Construction
Issued Oct 10, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF I NSPECTION,OBSERVED DEFECTED BALCONY SLAB AND LINTEL AT EXP1 WEST ELEVA TION AND DEFECTED SLAB ALSO AT EXP3 WEST ELEVATION.REMEDY:REPAIR AND/O R REPLACE
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X00736537-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X00736537-I1
- BIN
- 2009171
- BBL
- 2028800017
- Postal code
- 10453 · 209 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 101
- Proposed dwelling units
- 101








