What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1941, with 67 homes, on a 15,400 sq ft lot.
- Built
- 1941
- Floors
- 6
- Residential units
- 67
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 15,400 sq ft
- Building area
- 60,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 33 notices on file; the most recent was issued Mar 27, 2024.
- Construction
Issued Mar 27, 2024 — EMERGENCY WORK ORDER DUE TO SEVERE MASONARY CRACK&BULGING BRICKS@EXP#1 @ EXPO#1(NO. ELE)OBSERV.DETERIORATED LINTELS,MORTAR JOINTS,&SPALLLING WIND SILLS@ EXPO#1(NORTH ELE)ON ROOF CRACKS IN PARAPET.DAMAGED COPING STONE&DRUSTED ROOF RAILING ON EXPO.#1 PARAPET.REMEDY:IMMED.PROV.SAFETY MEASURES&REPAIR DEFECTED.FACADE.IMMED INSTALL S/WALK SHED @EXP#1
- (other bldgs types) - elevator affirmation of
Issued Nov 14, 2016 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
- (other bldgs types) - elevator affirmation of
Issued May 30, 2014 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01026652-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01026652-I1
- BIN
- 2008438
- BBL
- 2028650166
- Postal code
- 10453 · 146 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 67
- Proposed dwelling units
- 67








