What the filing says
A public-record reading of the proposed work.
Full demolition of a three (3) story building.
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story two-family home built in 1920, on a 3,000 sq ft lot.
- Built
- 1920
- Last altered
- 2016
- Floors
- 3
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R7-1
- Lot area
- 3,000 sq ft
- Building area
- 3,564 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Aug 10, 2022.
- Construction
Issued Aug 10, 2022 — W/O A PERMIT. NOTED: AT 2ND FLR - WATER & WASTE LINES INSTALLED FOR RESIDENTIAL SINK AT KITCHEN AREA. 220V ELECTRICAL LINE INSTALLED FOR STOVE. AT 1ST FLR - FULL HEIGHT PARTITION WALLS ERECTED TO CREATE A BTHRM. WATER & WASTE LINES INSTALLED FOR 3 PC BTHRM. ELECTRICAL WIRING INSTALLED FOR ADDL'T LIGHT & OUTLET.
- Construction
Issued Aug 10, 2022 — RESIDENCE CONVERTED FROM 2 TO 3 FAMILY DWELLING. NOTED: 1ST & 2ND FLR OBSERVED SUB-DIVIDED & 2ND FLR CONVERTED & OCCUPIED AS AN ADDL'T CLASS 'A APT WITH 3 PC BTHRM; KITCHEN WITH ELECTRIC STOVE, RESIDENTIAL SINK; 4 BDRMS.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01432201-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01432201-I1
- BIN
- 2014479
- BBL
- 2032060060
- Postal code
- 10453 · 272 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- Empty in the source