NYC DOB record · B00585578-I1

1636 President Street

1636 President Street, Brooklyn, NY 11213

Alteration filing in Crown Heights (South), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00585578-I1

1636 President Street

Brooklyn, NY 11213

Alteration filing · status dated Apr 27, 2022

Current record
Recorded as completed
Proposed scale
2 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00585578-I1 as a alteration filing at 1636 President Street, Brooklyn, NY 11213. Its latest published status category is Recorded as completed, dated Apr 27, 2022. The filing records 2 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Apr 27, 2022
Proposed scale
2 proposed stories and 3 proposed dwelling units
Applicant of recordSee the 21 filings that name As Engineering Services PC
FiledSep 21, 2021
Current recordRecorded as completed
Proposed scale2 stories
Recorded cost$15,000

What the filing says

A public-record reading of the proposed work.

Facade repair with general construction and structural work with temporary shoring. as per plans.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story walk-up apartment building built in 1920, with 3 homes, on a 3,000 sq ft lot.

Built
1920
Floors
2
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R4
Lot area
3,000 sq ft
Building area
2,720 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00585578-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 72,995 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00585578-I1
BIN
3037930
BBL
3014080016
Review type
Professional Certification
Existing stories
2
Proposed stories
2
Existing dwelling units
3
Proposed dwelling units
3
General constructionStructural work