What the filing says
A public-record reading of the proposed work.
Installation of new VERIZON telecommunications site. Installation of 12 RRH units, 9 antennas (3 sectors), 2 GPS units, and 1 equipment cabinet on the roof. All work in conformance with TPPN 5.98. No change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1931, with 8 homes, on a 2,500 sq ft lot.
- Built
- 1931
- Floors
- 4
- Residential units
- 8
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- M2-1
- Lot area
- 2,500 sq ft
- Building area
- 5,548 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 16 notices on file; the most recent was issued Nov 17, 2025.
- Construction
Issued Nov 17, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#341413 VIO#071625PI30601HZ DATED 07/16/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 07/31/25&START BLDG REPPAIRS UNDER PERMIT BY 09/16/25&COMPL/SIGNED OFF BY 10/16/25 AS OF 11/17/25 A REISSED CAP WAS NOT RESUBMITTED FOLLOWING DOB RECT. IMMED COMPLY W/COMMISSIONER'S ORDER VIO#071625PI30601HZ
- Construction
Issued Jul 16, 2025 — CORRECTIVE ACTION LAN REQ'D. OBSVD ALONG THE FRONT SIDE OF THE BLDG, DISLODGE FACIA BOARD UNDER THE LINTELCORNICE @ PARAPET LEVEL,BULGING WALL @ 4FL LEVEL TO THE RIGHT SIDE,ALONG THE REARSIDE OF THE BLDG OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NTC.GOV
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 6, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00124656-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
- Current status updated05
The latest recorded filing status is “LOC Issued.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00124656-I1
- BBL
- 3005740037
- Postal code
- 11231 · 2803 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source