What the filing says
A public-record reading of the proposed work.
Modification of an existing Verizon site. Replace (4) antennas and (6) RRHs. Install (2) new antennas, (1) platform with dunnage. Relocate (1) antenna and remove (2) antennas.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1931, with 8 homes, on a 2,500 sq ft lot.
- Built
- 1931
- Floors
- 4
- Residential units
- 8
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- M2-1
- Lot area
- 2,500 sq ft
- Building area
- 5,548 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 16 notices on file; the most recent was issued Nov 17, 2025.
- Construction
Issued Nov 17, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#341413 VIO#071625PI30601HZ DATED 07/16/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 07/31/25&START BLDG REPPAIRS UNDER PERMIT BY 09/16/25&COMPL/SIGNED OFF BY 10/16/25 AS OF 11/17/25 A REISSED CAP WAS NOT RESUBMITTED FOLLOWING DOB RECT. IMMED COMPLY W/COMMISSIONER'S ORDER VIO#071625PI30601HZ
- Construction
Issued Jul 16, 2025 — CORRECTIVE ACTION LAN REQ'D. OBSVD ALONG THE FRONT SIDE OF THE BLDG, DISLODGE FACIA BOARD UNDER THE LINTELCORNICE @ PARAPET LEVEL,BULGING WALL @ 4FL LEVEL TO THE RIGHT SIDE,ALONG THE REARSIDE OF THE BLDG OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NTC.GOV
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 6, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00884645-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00884645-I1
- BBL
- 3005740037
- Postal code
- 11231 · 2803 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 8
- Proposed dwelling units
- 8