NYC DOB record · M01407342-I1

164 East 72 Street

164 East 72 Street, Manhattan, NY 10021

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 5, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01407342-I1

164 East 72 Street

Manhattan, NY 10021

Alteration filing · status dated Oct 30, 2026

Current record
Approved
Proposed scale
15 stories
Dwelling units
42
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01407342-I1 as a alteration filing at 164 East 72 Street, Manhattan, NY 10021. Its latest published status category is Approved, dated Oct 30, 2026. The filing records 15 proposed stories and 42 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 30, 2026
Proposed scale
15 proposed stories and 42 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 1042822Applicant of recordSee the 10 filings that name Lawless and Mangione
FiledJun 24, 2026
Current recordApproved
Proposed scale15 stories
Recorded cost$155,000

What the filing says

A public-record reading of the proposed work.

Filing for cellar column repair at north-west corner as per plans filed herewith. No change in use, occupancy, egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story elevator apartment building built in 1925, with 42 homes, on a 8,786 sq ft lot.

Built
1925
Last altered
1980
Floors
15
Residential units
42
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10A
Lot area
8,786 sq ft
Building area
101,415 sq ft
Historic district
Upper East Side Historic District Extension

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 5, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 27 notices on file; the most recent was issued Feb 22, 2022.

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

  • Fail to certify class

    Issued Jan 15, 2014 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Fail to certify class

    Issued Jan 15, 2014 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 5, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01407342-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,085 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01407342-I1
BBL
1014060046
Review type
Standard Plan Examination
Existing stories
15
Proposed stories
15
Existing dwelling units
42
Proposed dwelling units
42
Structural work