What the filing says
A public-record reading of the proposed work.
At 2nd Floor - Remove and Install new equipment.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 20-story health facility built in 1923, with 155 homes, on a 20,487 sq ft lot.
- Built
- 1923
- Last altered
- 2017
- Floors
- 20
- Residential units
- 155
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R8
- Lot area
- 20,487 sq ft
- Building area
- 243,426 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 58 notices on file; the most recent was issued Apr 22, 2024.
- Construction
Issued Apr 22, 2024 — EMERGENCY WORK ORDER ACTIVE PARKINGSTRUCTURE CONSISTING OF 4 LEVELS (CELLAR AT ALL ,ABOVE GL&ROOF)SPALLING CONCRETE/EXPOSED REBAR CRACKED BEAM &SLAB AT CELLAR,AT GL AND ABOVE GL LEVEL AT SEVERAL LOC.CAUSING IMMED.HAZARD TO TRAFFIC.REMEDY;RETAIN A NYS RDP TO DIRECT&SUPERV.THE INSTALL.SAFETY MEASURES.UNDER FULL TIME SUPERV.PROV.DAILY PROG.REPORT
- Elevator
Issued Feb 6, 2012
- Elevator
Issued Feb 6, 2012
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01130613-P2.
- Current status updated02
The latest recorded filing status is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01130613-P2
- BBL
- 2028240005
- Postal code
- 10457 · 553 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 56
- Proposed dwelling units
- 56