What the filing says
A public-record reading of the proposed work.
Furnish and install new wet sprinkler system fire protection at 2nd floor neurology clinic. No changes to use, egress or occupancy under this alteration.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 20-story health facility built in 1923, with 155 homes, on a 20,487 sq ft lot.
- Built
- 1923
- Last altered
- 2017
- Floors
- 20
- Residential units
- 155
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R8
- Lot area
- 20,487 sq ft
- Building area
- 243,426 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 58 notices on file; the most recent was issued Apr 22, 2024.
- Construction
Issued Apr 22, 2024 — EMERGENCY WORK ORDER ACTIVE PARKINGSTRUCTURE CONSISTING OF 4 LEVELS (CELLAR AT ALL ,ABOVE GL&ROOF)SPALLING CONCRETE/EXPOSED REBAR CRACKED BEAM &SLAB AT CELLAR,AT GL AND ABOVE GL LEVEL AT SEVERAL LOC.CAUSING IMMED.HAZARD TO TRAFFIC.REMEDY;RETAIN A NYS RDP TO DIRECT&SUPERV.THE INSTALL.SAFETY MEASURES.UNDER FULL TIME SUPERV.PROV.DAILY PROG.REPORT
- Elevator
Issued Feb 6, 2012
- Elevator
Issued Feb 6, 2012
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01130639-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01130639-I1
- BBL
- 2028240005
- Postal code
- 10457 · 553 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 56
- Proposed dwelling units
- 56