What the filing says
A public-record reading of the proposed work.
Installation of sidewalk shed for public protection during construction work. No change on egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story place of public assembly built in 1930, on a 24,556 sq ft lot.
- Built
- 1930
- Last altered
- 2002
- Floors
- 5
- Residential units
- 0
- Building type
- Place of public assembly
- Land use
- Public facilities and institutions
- Zoning district
- R7D
- Lot area
- 24,556 sq ft
- Building area
- 61,030 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 59 notices on file; the most recent was issued Oct 1, 2024.
- Construction
Issued Oct 1, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. EXPOSURE #1 OBSERVED SPALLING/DETERIORATING WINDOW FRAME/LINTEL ABOVE FRONT ENTRANCE WINDOW SILL DAMAGED/MISSING MOTAR JOINT. EXP#2 DAMAGED/SPALL/ DETERIORATING WINDOW FRAMES & WINDOW SILLS AT EXP#4 SPALLING/CRACK WATER TABLE AROUND 3FL. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued May 7, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTE: OBSERVED DETERIORATING WINDOW FRAME, SPALLED MASONRY, RUSTED CORNICE @ MULTIPLE LOCAITONS ON EXP 1,2,3 & 4.) REMEDY: FIX AND/OR REPLACE
- Elevator
Issued Dec 16, 2019
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 15, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00834700-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 80,574 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00834700-I1
- BIN
- 1051991
- BBL
- 1016330013
- Postal code
- 10029 · 392 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








