What the filing says
A public-record reading of the proposed work.
8' high solid fence around property perimeter in conjunction with demo#220694639
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story elevator apartment building built in 2022, with 40 homes, on a 6,782 sq ft lot.
- Built
- 2022
- Last altered
- 2019
- Floors
- 8
- Residential units
- 40
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7X
- Lot area
- 6,782 sq ft
- Building area
- 49,013 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 9 notices on file; the most recent was issued Jun 26, 2026.
- Construction
Issued Jun 26, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP1 EAST ELEV,CRACKS & SPALLING IN BUILDING MATERIAL AT SEVERAL LOCATIONS.ALSO OPEN & UNFINISHED WINDOWS ON EXP1 EAST ELEV WITH NO NETTING OR OTHER SAFETY MEASURE COVERING WIN DOW OPENING TO PREVENT STUFF FROM FALLING.REMEDY:REPAIR OR REPLACE
- Construction
Issued Oct 7, 2025 — FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE IN A CODE COMPLIANT MANNER. NOTE AT TIME OF INSPECTION OBSERVED MULTIPLE MISSING PANNELS AT ALL EXP# 1,2,3,4 MULTIPLE AREAS OF SPALLING COATING/DAMAGED PANNELS MULTIPLE LOCATIONS WATER DAMAGE PRSENT ON FACADE. REMEDY: REPAIR AND REPLACE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X00173939-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X00173939-I1
- BBL
- 2030150025
- Postal code
- 10460 · 122 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








