NYC DOB record · B00402746-I1

175 Ashford Street

175 Ashford Street, Brooklyn, NY 11207

Alteration filing in Cypress Hills, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00402746-I1

175 Ashford Street

Brooklyn, NY 11207

Alteration filing · status dated May 16, 2022

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00402746-I1 as a alteration filing at 175 Ashford Street, Brooklyn, NY 11207. Its latest published status category is Recorded as completed, dated May 16, 2022. The filing records 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
May 16, 2022
Proposed scale
2 proposed dwelling units
Complete building dossierView all 2 filings associated with BIN 3087948Applicant of recordSee the 974 filings that name Syed Engineering, P.C.
FiledSep 24, 2020
Current recordRecorded as completed
Proposed scale2 units
Recorded cost$8,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story two-family home built in 1905, on a 1,667 sq ft lot.

Built
1905
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R5B
Lot area
1,667 sq ft
Building area
1,696 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 10 notices on file; the most recent was issued Mar 2, 2018.

  • Construction

    Issued Mar 2, 2018 — FTM DUE TO 2 ALARM FIRE ON 12/21/17.PREM IS 2 STRY+CELLAR,WOOD FRAMED W/NOGGING WALLS,2 FAM RESID SEMI ATTACH BLDG.EXP 1 FRONT WALL HAS MINOR FIRE DAMAGE&25% OF EXT HAS DAMAGED SIDING/SHEATHING.REMEDY:PROV RPRS UND PERM.PULL PERM NO LATER THAN 9/3/18.PERM SIGNOFF NO LATER THAN 12/3/18

  • Construction

    Issued Dec 21, 2017 — DUE TO FIRE

  • Fail to certify class

    Issued May 18, 2016 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 4 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00402746-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00402746-I1
BBL
3039530009
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
2
Proposed dwelling units
2