What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. Work to comply with New York City Building code Chapter 33. No change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 40-story elevator apartment building built in 1975, with 576 homes, on a 49,146 sq ft lot.
- Built
- 1975
- Floors
- 40
- Residential units
- 576
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C2-8
- Lot area
- 49,146 sq ft
- Building area
- 693,459 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 141 notices on file; the most recent was issued Oct 31, 2024.
- Construction
Issued Oct 31, 2024 — STRUCTURE RENDERED NON COMPLIANT DAMAGES OBSERVED TO HAVE BEEN SUSTAIN ED BY VEHICLE IMPACT. VEHICLE IMPACTED SIDEWALK SHED ON 92ND STREET DISLOGING A HORIZONTAL SUPPORT AT THE PARK LOT
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01033399-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01033399-I1
- BIN
- 1048914
- BBL
- 1015370022
- Postal code
- 10128 · 192 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 578
- Proposed dwelling units
- 578








