NYC DOB record · M01408663-I1

180 Park Row

180 Park Row, Manhattan, NY 10038

Alteration filing in Chinatown-Two Bridges, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01408663-I1

180 Park Row

Manhattan, NY 10038

Alteration filing · status dated Nov 4, 2026

Current record
Recorded as completed
Proposed scale
25 stories
Dwelling units
119
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01408663-I1 as a alteration filing at 180 Park Row, Manhattan, NY 10038. Its latest published status category is Recorded as completed, dated Nov 4, 2026. The filing records 25 proposed stories and 119 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 4, 2026
Proposed scale
25 proposed stories and 119 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1077438Applicant of recordSee the 2 filings that name Fradkin & Mcalpin Architects, LLP
FiledJun 23, 2026
Current recordRecorded as completed
Proposed scale25 stories
Recorded cost$36,000

What the filing says

A public-record reading of the proposed work.

Minor Interior renovation of existing apartment #2b on the 2nd floor. Architectural / Construction work only.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 25-story elevator apartment building built in 1965, with 250 homes, on a 68,732 sq ft lot.

Built
1965
Floors
25
Residential units
250
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
C6-1
Lot area
68,732 sq ft
Building area
306,862 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01408663-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01408663-I1
BBL
1001610001
Review type
Professional Certification
Existing stories
25
Proposed stories
25
Existing dwelling units
119
Proposed dwelling units
119
General construction