What the filing says
A public-record reading of the proposed work.
Plumbing application herewith filed in conjunction with application # 321590603
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1905, on a 2,583 sq ft lot.
- Built
- 1905
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R4-1
- Lot area
- 2,583 sq ft
- Building area
- 1,428 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 4 notices on file; the most recent was issued Mar 2, 2022.
- Fail to certify class
Issued Mar 2, 2022 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Jan 11, 2022 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPEDAPPLICATION#321590603 ON 1/12/22 DUE TO CONTRACTOR WITHDRAWAL
- Construction
Issued Jan 11, 2022 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPEDAPPLICATION#321590603 ON 1/12/22 DUE TO CONTRACTOR WITHDRAWAL
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00351840-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00351840-I1
- BIN
- 3196966
- BBL
- 3072970007
- Postal code
- 11229 · 1563 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








