What the filing says
A public-record reading of the proposed work.
Installation of 26' new sidewalk shed as indicated on plans. there will be no change in the use, egress, or occupancy under this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story walk-up apartment building built in 1915, with 23 homes, on a 2,940 sq ft lot.
- Built
- 1915
- Last altered
- 1988
- Floors
- 6
- Residential units
- 23
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R8B
- Lot area
- 2,940 sq ft
- Building area
- 13,524 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 26, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 4 notices on file; the most recent was issued May 15, 2014.
- Low pressure boiler
Issued May 15, 2014 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
- Local law 62/91 - boilers
Issued Sep 16, 1997
- Local law 62/91 - boilers
Issued Aug 29, 1995
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01260899-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,253 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01260899-I1
- BIN
- 1004950
- BBL
- 1003970025
- Postal code
- 10009 · 302 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 23
- Proposed dwelling units
- 23