NYC DOB record · Q01006882-I1

19-20 Brookhaven Avenue

19-20 Brookhaven Avenue, Queens, NY 11691

Alteration filing in Far Rockaway-Bayswater, Queens. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01006882-I1

19-20 Brookhaven Avenue

Queens, NY 11691

Alteration filing · status dated Sep 14, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01006882-I1 as a alteration filing at 19-20 Brookhaven Avenue, Queens, NY 11691. Its latest published status category is Approved, dated Sep 14, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 14, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 89 filings that name Bohler Engineering NY PLLC.
FiledMar 1, 2024
Current recordApproved
Proposed scaleNot specified
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Phase 2 of Civil Site Work filed in conjunction with NB filing job #421133507

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story health facility built in 2022, on a 47,569 sq ft lot.

Built
2022
Floors
4
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
R5
Lot area
47,569 sq ft
Building area
72,790 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01006882-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 63,690 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01006882-I1
BIN
4624157
BBL
4155660001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0
Earthwork