NYC DOB record · M01337882-S1

19 Leonard Street

19 Leonard Street, Manhattan, NY 10013

Alteration filing in Tribeca-Civic Center, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01337882-S1

19 Leonard Street

Manhattan, NY 10013

Alteration filing · status dated Sep 17, 2026

Current record
Recorded as completed
Proposed scale
5 stories
Dwelling units
5
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01337882-S1 as a alteration filing at 19 Leonard Street, Manhattan, NY 10013. Its latest published status category is Recorded as completed, dated Sep 17, 2026. The filing records 5 proposed stories and 5 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 17, 2026
Proposed scale
5 proposed stories and 5 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1002008Applicant of recordSee the 5 filings that name Barry J. Bank, P.E., Consulting Eng
FiledMar 17, 2026
Current recordRecorded as completed
Proposed scale5 stories
Recorded cost$66,000

What the filing says

A public-record reading of the proposed work.

Filed to propose wet bar and replacement of bathroom plumbing fixtures at first floor apartment.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story condominium built in 1868, with 7 homes, on a 4,500 sq ft lot.

Built
1868
Floors
4
Residential units
7
Building type
Condominium
Land use
Walk-up apartments
Zoning district
C6-2A
Lot area
4,500 sq ft
Building area
14,368 sq ft
Historic district
Tribeca West Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 34 notices on file; the most recent was issued Apr 6, 2026.

  • Construction

    Issued Apr 6, 2026 — FTM BLDG IN CODE COMPLIANT MANNER-OBSVD SAGGING WINDOW HEADERS-STONE W/CRACKED OR BROKEN BRICK UNDERNEATH,BRICK STEP CRACKS,MISSING MORTAR AROUND BRICKS,PARTS MISSING W/METAL CORNICE. OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIE BLDG,PREPARE/FILE REPAIR DWGS, REPAIR BLDG UNDER PERMIT, START WORK BY 06/06/2026

  • Landmark

    Issued Apr 2, 2026

  • Local law 10/81 -

    Issued Jan 13, 1997

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01337882-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01337882-S1
BBL
1001797501
Review type
Professional Certification
Existing stories
5
Proposed stories
5
Existing dwelling units
5
Proposed dwelling units
5