What the filing says
A public-record reading of the proposed work.
Alteration type 2 for community facilty unit 140 on the first floor, fitout for daycare exisitng conditions per nb# 121206818. no change of occpancy, use, and egress is proposed under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story elevator apartment building built in 2021, with 93 homes, on a 15,166 sq ft lot.
- Built
- 2021
- Floors
- 8
- Residential units
- 93
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7-2
- Lot area
- 15,166 sq ft
- Building area
- 123,251 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 2 notices on file; the most recent was issued Mar 16, 2020.
- Construction
Issued Mar 16, 2020 — EMERG WORK:THE REAR WALL & SCAFFOLD COLLAPSED FROM 3RD-2FL AND DEBRIS WERE SCATTERED ON ADJACENT REAR YARDS/LOTS.APPROXIMATELY 17'HIGH WALL AT REAR & SIDE ARE UNBRACED&IN DANGER OF COLLAPSE.IMMEDDEMO UNBRACED WALLS TO A SAFE LEVEL.REMOVE COLLAPSED SCAFFOLD&DEBRIS FROM ADJ PROPER ALL WRK UNDR FULL TIME SUPV PE.STRT N/L/ 3/17/20.FINISH BY 3/19/20 EOD
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01367765-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01367765-I1
- BBL
- 1017510020
- Postal code
- 10035 · 154 filings
- Review type
- Standard Plan Examination
- Existing stories
- 8
- Proposed stories
- 8
- Existing dwelling units
- 97
- Proposed dwelling units
- 97








