What the filing says
A public-record reading of the proposed work.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story place of worship built in 2022, on a 5,395 sq ft lot.
- Built
- 2022
- Floors
- 7
- Residential units
- 0
- Building type
- Place of worship
- Land use
- Public facilities and institutions
- Zoning district
- R7-2
- Lot area
- 5,395 sq ft
- Building area
- 107,734 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 14 notices on file; the most recent was issued May 26, 2026.
- Construction
Issued May 26, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COPLIANT MANNER. NOTE: OBSERVED DEFECTIVE CONDITIONS AT CONSTRUCTION PROJECT. OPEN H-BEAMS, WINDOWS EXPOSED TO THE ELEMENTS, MISSING BLOCK, AND UNCAPPED REBAR. ALSO EXPOSED ELECTRICAL WIRING. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued May 26, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED DEFECTED FACADE CONDITIONS AT CONSTRUCTION AT CONSTRUCTION PROJECT OPEN H-BEAMS, WINDOW EXPOSE TO THE ELEMENTS, MISSING BLOCK, AND UNCAPPED REBAR. ALSO EXPOSE ELECTRIC WIRING. REMEDY: REPAIR AND/OR REPLACE
- Immediate
Issued Mar 25, 2026 — REMOVE APPROXIMATELY 30 LF OF CHAIN-LINK CONSTRUCTION BARRIER AT EXPO# 1 AND REPLACE WITH APPROX. 30LF OF TIGHT-BOARD CONSTRUCTION FENCING TO PREVENT UNAUTHORIZED ACCESS
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M08032295-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M08032295-I1
- BBL
- 1017510120
- Postal code
- 10035 · 94 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0