What the filing says
A public-record reading of the proposed work.
Herewith filing structural modifications in conjunction with m01314231
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story condominium built in 1900, on a 11,750 sq ft lot.
- Built
- 1900
- Floors
- 7
- Residential units
- 0
- Building type
- Condominium
- Land use
- Commercial and office
- Zoning district
- C6-2
- Lot area
- 11,750 sq ft
- Building area
- 74,349 sq ft
- Historic district
- SoHo-Cast Iron Historic District Extension
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 5, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 87 notices on file; the most recent was issued Oct 20, 2025.
- Construction
Issued Oct 20, 2025 — I OBSERVED FIRE DAMAGE THROUGHOUT THE SIX FLOOR DUE TO ELECTRICAL EXTENSION CORD CONNECTED DIRECTLY TO MAIN PANEL LUGS WITHOUT OVERCURRENT PROTECTION.
- Construction
Issued Oct 18, 2025 — STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED AT THE 6 FLOOR EXTENSIVE FIRE, SMOKE AND WATER DAMAGE, WOODEN FLOOR/CEILING JOIST CHARRED. AT 7TH FLOOR LEVEL OPENINGS IN THE FLOOR AND WATER DAMAGE. ALSO WATER DAMAGE THROUGHOUT BUILDING.
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 5, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01383412-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
- Current status updated05
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,085 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01383412-I1
- BBL
- 1004827501
- Postal code
- 10012 · 730 filings
- Review type
- Standard Plan Examination
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








