What the filing says
A public-record reading of the proposed work.
The scope of work includes the installation of outriggers as shown in provided drawings for local law 11 masonry facade repair. no change in use, egress, or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story condominium built in 1900, on a 11,750 sq ft lot.
- Built
- 1900
- Floors
- 7
- Residential units
- 0
- Building type
- Condominium
- Land use
- Commercial and office
- Zoning district
- C6-2
- Lot area
- 11,750 sq ft
- Building area
- 74,349 sq ft
- Historic district
- SoHo-Cast Iron Historic District Extension
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 87 notices on file; the most recent was issued Oct 20, 2025.
- Construction
Issued Oct 20, 2025 — I OBSERVED FIRE DAMAGE THROUGHOUT THE SIX FLOOR DUE TO ELECTRICAL EXTENSION CORD CONNECTED DIRECTLY TO MAIN PANEL LUGS WITHOUT OVERCURRENT PROTECTION.
- Construction
Issued Oct 18, 2025 — STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED AT THE 6 FLOOR EXTENSIVE FIRE, SMOKE AND WATER DAMAGE, WOODEN FLOOR/CEILING JOIST CHARRED. AT 7TH FLOOR LEVEL OPENINGS IN THE FLOOR AND WATER DAMAGE. ALSO WATER DAMAGE THROUGHOUT BUILDING.
- Construction
Issued Oct 18, 2025 — REQUESTING ENGINEERING REPORT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED EXTENSIVE FIRE,SMOKE AND WATER DAMAGE. THE WOODEN FLOOR JOIST HAS BEEN BADLY CHARRED. AT THE 7TH FLOOR LEVEL OBSERVED HOLES IN THE FLOOR AND WATER DAMAGE.
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01430222-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01430222-I1
- BIN
- 1066733
- BBL
- 1004827501
- Postal code
- 10012 · 320 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source