NYC DOB record · M01249047-I1

2 East End Avenue

2 East End Avenue, Manhattan, NY 10075

Alteration filing in Upper East Side-Yorkville, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 4, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01249047-I1

2 East End Avenue

Manhattan, NY 10075

Alteration filing · status dated Sep 1, 2026

Current record
Approved
Proposed scale
9 stories
Dwelling units
57
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01249047-I1 as a alteration filing at 2 East End Avenue, Manhattan, NY 10075. Its latest published status category is Approved, dated Sep 1, 2026. The filing records 9 proposed stories and 57 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 1, 2026
Proposed scale
9 proposed stories and 57 proposed dwelling units
Applicant of recordSee the 14 filings that name Rand Engineering & Architecture
FiledOct 21, 2025
Current recordApproved
Proposed scale9 stories
Recorded cost$350,000

What the filing says

A public-record reading of the proposed work.

Firestop common hall demising wall openings above existing suspended ceiling including selective removal of existing gypsum ceiling & patching of gypsum ceiling at the completion of firestopping. No change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 10-story elevator apartment building built in 1910, with 57 homes, on a 15,121 sq ft lot.

Built
1910
Floors
10
Residential units
57
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10A
Lot area
15,121 sq ft
Building area
147,991 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 28 notices on file; the most recent was issued Dec 28, 2020.

  • Elevator

    Issued Dec 28, 2020

  • Construction

    Issued Nov 28, 2017 — BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER UNDER APPLICATION #1 22631624 DUE TO WITHDRAWAL OF APPLICANT FROM CONSTRUCTION WORK. UNABLE TO DETERMINE % OF WORK COMPLETED. STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE, PROVIDE ALL REQUIRED INFORMATION TO BOROUGH COMMISSION ER IMMEDIATELY

  • Low pressure boiler

    Issued May 15, 2014 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01249047-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01249047-I1
BIN
1050767
BBL
1015760023
Review type
Standard Plan Examination
Existing stories
9
Proposed stories
9
Existing dwelling units
57
Proposed dwelling units
57
General construction