NYC DOB record · X01461369-I1

20 East 190 Street

20 East 190 Street, Bronx, NY 10468

Alteration filing in University Heights (North)-Fordham, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01461369-I1

20 East 190 Street

Bronx, NY 10468

Alteration filing · status dated Oct 14, 2026

Current record
Approved
Proposed scale
5 stories
Dwelling units
43
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01461369-I1 as a alteration filing at 20 East 190 Street, Bronx, NY 10468. Its latest published status category is Approved, dated Oct 14, 2026. The filing records 5 proposed stories and 43 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 14, 2026
Proposed scale
5 proposed stories and 43 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 2014126Applicant of recordSee the 536 filings that name Mchenery Testing Lab
FiledSep 29, 2026
Current recordApproved
Proposed scale5 stories
Recorded cost$4,800

What the filing says

A public-record reading of the proposed work.

Window lintel replacement as per plan. no change in use, egress or occupancy with this application

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1923, with 43 homes, on a 10,710 sq ft lot.

Built
1923
Floors
5
Residential units
43
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
C4-4
Lot area
10,710 sq ft
Building area
40,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 16, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 14 notices on file; the most recent was issued Sep 23, 2025.

  • Construction

    Issued Sep 23, 2025 — FTC COMPLY W/COMMISSIONER'S ORDER CONTROL#342157 VIO#052725PI20702SB DATED 05-27-25 REQUIRING OWNER TO SUBMIT CORRECTIVE ACTION PLAN BY 30 DAYS FROM DATE OF INSP START BLDG REPAIRS UNDER PERMIT BY 7/27/25 IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#342157 & VIO# 052725PI20702SB TO PROVIDE A CORRECTIVE ACTION PLAN

  • Construction

    Issued May 27, 2025 — CORRECTION ACTION PLAN REQ'D. OBSVD @ EXP1 MASONRY CRACKS/SPALLING @ MULTIPLE LOCATIONS. OBSVD @ EXP2 CRACKED GLASS WINDOW @ 2FL @ EXP2/3 OBSVD MASONRY BULGING @ THE PARAPET LEVEL. @ THE INTERIOR COURTYARD OBSVD A CRACKED WINDOW ON 2FL. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & TO SUMBIT CORRECTIVE ACTION PLAN WITHIN 30 DAYS

  • Construction

    Issued May 27, 2025 — EMERGENCY WORK ORDER REQ'D. OBSVD @ EXP3 INTERIOR COURTYARD, HAZ COND SUCH AS DETERIORATED MORTAR JOINTS, CRACKED/SPALLING MASONRY @ PARAPET LEVEL & A CRACKED GLASS WINDOW ON 2FL. IMMED PROVIDE SAFETY MEASURES TO SECURE/PROTECT PUBLIC @ EXP3 INTERIOR COUTYARD WHICH IS THE TENANTS MAIN EGRESS PATH:INSTALL S/W SHED APPROX 90 LINEAR FT

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01461369-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,269 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01461369-I1
BBL
2031890020
Review type
Professional Certification
Existing stories
5
Proposed stories
5
Existing dwelling units
43
Proposed dwelling units
43
General construction