What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1942, with 54 homes, on a 11,418 sq ft lot.
- Built
- 1942
- Floors
- 6
- Residential units
- 54
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8
- Lot area
- 11,418 sq ft
- Building area
- 48,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 28 notices on file; the most recent was issued Feb 12, 2025.
- Construction
Issued Feb 12, 2025 — EWO OBSERVED EXP1 S.ELEV AND EXP4 E.ELVE STEP/VERTICAL CRACK @ PARAPET /TOP AND SEVERAL LOCAT. NO SAFETY MEASURES IN PLACE. REMEDY:IMMEDLY PROVIDE ADEQUATE SAFETY MEASURES (SIDEWAK SHED) @ EXP 1&4 SOUTH & EAST ELEVATION FULL LENGTH (EAST 190ST & CRESTON AVE) TO SECURE PUBLIC SAFE TY. IMMEDIATELY REPAIR DEFECTIVE FACADE UNDR NYS PE/RA SUPERVISION
- Fail to certify class
Issued Jul 21, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Fail to certify class
Issued Jan 20, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01180727-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,309 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01180727-I1
- BIN
- 2013929
- BBL
- 2031750001
- Postal code
- 10468 · 182 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 54
- Proposed dwelling units
- 54








