NYC DOB record · M00832547-I1

200 East 64 Street

200 East 64 Street, Manhattan, NY 10065

Alteration filing in Upper East Side-Lenox Hill-Roosevelt Island, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00832547-I1

200 East 64 Street

Manhattan, NY 10065

Alteration filing · status dated Oct 1, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
112
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00832547-I1 as a alteration filing at 200 East 64 Street, Manhattan, NY 10065. Its latest published status category is Approved, dated Oct 1, 2026. The filing records 112 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 1, 2026
Proposed scale
112 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1043866Applicant of recordSee the 872 filings that name Kz Engineering, P.C
FiledMar 8, 2023
Current recordApproved
Proposed scale112 units
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 30-story elevator apartment building built in 1968, with 112 homes, on a 13,054 sq ft lot.

Built
1968
Last altered
1988
Floors
30
Residential units
112
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
C1-9
Lot area
13,054 sq ft
Building area
215,465 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 115 notices on file; the most recent was issued Mar 21, 2025.

  • Construction

    Issued Mar 21, 2025 — EWO PARKIG STRUCT CONSIST OF 3 LVL OBSERVED DAMAGE BEAM ON LVL 2 CAUSI NG IMMEDIATE HAZARD TO VEHICULAR/PEDESTRIAN TRAFFIC REQUIRING SAFETY MEASURE TO BE IMPLEMENTED.REMEDY:OWNER TO RETAIN A NYS RDP TO DIRECT & SUPERVISE THE IMMEDIATE INSTALLATION OF SAFETY MEAS ON LVL 2 CELLAR & IMPLEMENT CLEAR DELINATION & SAFE GUARDING NAVIGATION OF DRIVERS/PEDES

  • Failure to correct swarmp conditions (facade)

    Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS

  • Fail to certify class

    Issued Oct 4, 2023 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 3, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00832547-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00832547-I1
BBL
1014180045
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
112
Proposed dwelling units
112
Sidewalk shed