What the filing says
A public-record reading of the proposed work.
Remove & replace entire existing sprinkler system, piping, & associated supports. Provide sprinkler booster pump, jockey pump with all accessories, valves, controls, supports and pump test header.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story educational building built in 1965, on a 79,932 sq ft lot.
- Built
- 1965
- Last altered
- 2011
- Floors
- 3
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- R7-2
- Lot area
- 79,932 sq ft
- Building area
- 200,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 50 notices on file; the most recent was issued May 20, 2019.
- Non-residential elevator periodic
Issued May 20, 2019 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
- Construction
Issued Jun 27, 1990
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01024451-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01024451-S2
- BIN
- 1054156
- BBL
- 1017520022
- Postal code
- 10035 · 158 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0