NYC DOB record · M01250291-I1

203 West 94 Street

203 West 94 Street, Manhattan, NY 10025

Alteration filing in Upper West Side (Central), Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01250291-I1

203 West 94 Street

Manhattan, NY 10025

Alteration filing · status dated Nov 17, 2026

Current record
Recorded as completed
Proposed scale
6 stories
Dwelling units
24
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01250291-I1 as a alteration filing at 203 West 94 Street, Manhattan, NY 10025. Its latest published status category is Recorded as completed, dated Nov 17, 2026. The filing records 6 proposed stories and 24 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 17, 2026
Proposed scale
6 proposed stories and 24 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 1033689Applicant of recordSee the 113 filings that name Pace Engineering P.C.
FiledOct 20, 2025
Current recordRecorded as completed
Proposed scale6 stories
Recorded cost$287,850

What the filing says

A public-record reading of the proposed work.

Ll11 related repairs as per plans. no change in use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1925, with 24 homes, on a 5,500 sq ft lot.

Built
1925
Last altered
1985
Floors
6
Residential units
24
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8
Lot area
5,500 sq ft
Building area
22,800 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 20, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01250291-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01250291-I1
BBL
1012420128
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
24
Proposed dwelling units
24
General construction