What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story garage or fuel station built in 1939, on a 34,054 sq ft lot.
- Built
- 1939
- Floors
- 5
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- R8
- Lot area
- 34,054 sq ft
- Building area
- 196,590 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 91 notices on file; the most recent was issued Aug 7, 2026.
- Construction
Issued Aug 7, 2026 — EWO DUE TO CRACKED/SPALLING BRICK MASONRY DETERIORATED MORTAR JOINTS & WALL MOVEMENT @ PARAPET EXP2. ALSO CRACKS ON MASONRY & LOOSE/DAMAGED MORTAR JOINTS.BROKEN/CRACKED WINDOW PANES EXP 1,2 AND 3. REMEDY: IMMEDIATELY INSTALL SIDEWALK SHED AT ALL EXPOSURES UNDER THE DIRECTION & SUPERVISION OF A LICENSED PROFESSIONAL ENGINEER
- Construction
Issued Aug 7, 2026 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. EXP2 CRACKED & SPALLING BRK MASONRY, DETERIORATED MORTAR JOINTS & WALL MOVEMENT @ THE PARAPET AREA. CRACKS ON MASONRY & LOOSE/DAMAGED MORTAR JOINTS WERE OBSERVED ALONG WITH BROKEN/CRACKED WINDOW PANES ON EXPOSURE 1,2 & 3 REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Oct 21, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT THE TIME OF INSPECTION,I OBSERVED ON EXP1,2,3,4 CRACKS,STEP CRACKS,SPALLIN G,ERODED MORTAR JOINT AND BRICKS,SAGGING CORRODED METAL LINTELS,BROKEN WINDOW PANES AT MULTIPLE LOCATIONS AND FLOORS ALSO PARAPET.REMEDY:REPA IR AND/OR REPLACE DAMAGED FACADE AND APPURTENANCES
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01443334-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01443334-I1
- BIN
- 2097576
- BBL
- 2039430205
- Postal code
- 10462 · 201 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 0