NYC DOB record · X01477615-I1

503 East Tremont Avenue

503 East Tremont Avenue, Bronx, NY 10457

Alteration filing in Tremont, Bronx. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01477615-I1

503 East Tremont Avenue

Bronx, NY 10457

Alteration filing · status dated Nov 4, 2026

Current record
Approved
Proposed scale
1 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01477615-I1 as a alteration filing at 503 East Tremont Avenue, Bronx, NY 10457. Its latest published status category is Approved, dated Nov 4, 2026. The filing records 1 proposed story.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 4, 2026
Proposed scale
1 proposed story
Applicant of recordSee the 94 filings that name Mj Engineering & Design
FiledOct 29, 2026
Current recordApproved
Proposed scale1 stories
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Repair of the Rear Exterior CMU Block Wall, Including Replacement of Missing, Loose, and Deteriorated CMU Blocks to address violation #35718774Y.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 3 notices on file; the most recent was issued Sep 2, 2026.

  • Construction

    Issued Sep 2, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP3 NEAR 3/4 CORNER DETERIORATED CMU MASONRY BLOCKS NEAR PARAPET DIRECTLY ABOVE AN ACTIVE JOB SITE OWNER TO RETAIN IMMED REG DESING PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 10/2/2026

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 6, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01477615-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 92,577 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01477615-I1
BIN
2118217
BBL
2030430043
Review type
Professional Certification
Existing stories
1
Proposed stories
1
Existing dwelling units
0
Proposed dwelling units
0
Structural work